MIXED USED / RETAILS

  • Home
  • / /
  • MIXED USED / RETAILS

Project Description

BAIS CITY MALL MARKET COMPLEX IN BAIS CITY, NEGROS ORIENTAL,PHILIPPINES
The first ever Government owned building inaugurated by the President of the Republic of the Philippines by His Excellency Benigno Simeon Aquino III. Project Owned by the City Government of Bais City. Located at Bais City Negros Oriental, Philippines with constructed floor area of 10,000 square meters and designed for commercial businesses like foods, wholesale, Retail, Banks and other public market business in nature. Services rendered include Architectural + Engineering Design Consultancy. Project costs at US $6.7 M was completed Year 2011.

01-1

SAN NICOLAS MARKET IN ANGELES, PAMPANGA, PHILIPPINES
Project owned by City Government of Angeles City,Pampanga. Has a lot area of 4,860 square meters and constructed floor area of 14,600 square meters and located at Barangay San Nicolas, Angeles Pampanga, Philippines. Service rendered include Architectural + Engineering Design Consultancy. Project costs at US $ 9.8 M and was completed Year 2007.

Untitled-1

NORTHFOOD EXCHANGE IN BALAGTAS, BULACAN,PHILIPPINES
Project is owned by Southeast Asian Commodities Food Exchange, Incorporated. Located at Balagtas, Bulacan, Philippines. Project Constructed area of 42,545.92 square meters. Building design to accommodate wholesale and retail wet, semi wet and dry goods. Also accommodates Shops, banks, entertainment and events venue. Service rendered includes Architectural Design Consultancy. Project cost at US $ 28.6 M and Contract documentation Design Phase completed Year 2013.

01-4

TWINS PLAZA ARCADE IN CITY OF MALOLOS, BULACAN, PHILIPPINES
Project owned by Twins Properties and Realty Corporation. Located at City of Malolos, Province of Bulacan, Philippines. Services rendered include Architectural + Engineering Design Consultancy Services. Project cost at US $ 750,000.00 and was completed Year 2001.

01-3

SALEM INTERNATIONAL COMMERCIAL CENTER IN PASAY CITY, PHILIPPINES
Project owned by Salem Investment Corporation. Has a constructed floor area of 15,000 square meters and located at Domestic Road, Domestic Airport, Pasay Ciy, Philippines. Services rendered include Architectural + Engineering Design Consultancy Services. Project costs at US $ 3.8 M and was completed Year 2005.

01

OLONGAPO CITY COMMERCIAL CENTER IN OLONGAPO CITY, PHILIPPINES
Project owned by City Government of Olongapo. Locater at 20 Washington Street Lower Kalakhan Olongapo City, Philippines. Services rendered include Architectural + Engineering Design Consultancy Services. Project costs at US $ 7.2 M and was completed Year 2001.

01-1

85 TIMOG COMMERCIAL IN TIMOG AVENUE, QUEZON CITY, PHILIPPINES
Project is owned by Metrostonerich Corporation and located at 85 Timog Avenue, Quezon City, Philippines. Service rendered includes Architectural Design Consultancy. Project costs at US $ 3 M and Schematic Design Phase was completed Year 2002.

SEN AND SONS BUILDING 10 PROJECT

This project Owned by A.M. Trading Corporation and has a lot area of 5,877.00 Square meters and constructed floor area of 16,450.00 Square meters. Located at B. Aquino Avenue, Mandurriao, Iloilo City, Philippines. Services rendered includes Architectural , Structural, Mechanical, Sanitary/Plumbing and Fire Protection Design Consultancy. Project cost at US $ 15 M and on its Schematic Design Phase.

MC HOME DEPOT, IMUS, CAVITE

This project is Owned by MC Home Depot, Incorporated.  Has a constructed floor area of 10,170.00 Square meters. Services rendered includes Architectural Conceptual Design Consultancy. Project cost at US $ 6.8M          and on its Schematic Design Phase.

AEON BLEU, DAVAO CITY PHILIPPINES

This project is Owned by Aeon Luxe Philippines, Mr. Ian Cruz, as CEO/President. Has a lot area of 16,694 square meters and a construction floor area of 101,447.00 Square meters. Services rendered includes Architectural Design Consultancy. Project cost at US $ 115M.

VESTER RESIDENCES -ANGELES, ANGELES CITY, PAMPANGA

This project is owned by Vester Corporation, Mr. Alexander Bangsoy as CEO. Having a construction floor area of 26,776 Square meters. Services rendered Architectural Design Consultancy Services. Project Cost of US $ 20 M.